Babysitter dbr-scheduler
Drum-Buffer-Rope scheduling skill for constraint-based production pacing with buffer management
install
source · Clone the upstream repo
git clone https://github.com/a5c-ai/babysitter
Claude Code · Install into ~/.claude/skills/
T=$(mktemp -d) && git clone --depth=1 https://github.com/a5c-ai/babysitter "$T" && mkdir -p ~/.claude/skills && cp -r "$T/library/specializations/domains/business/operations/skills/dbr-scheduler" ~/.claude/skills/a5c-ai-babysitter-dbr-scheduler && rm -rf "$T"
manifest:
library/specializations/domains/business/operations/skills/dbr-scheduler/SKILL.mdsource content
DBR Scheduler
Overview
The DBR (Drum-Buffer-Rope) Scheduler skill provides comprehensive capabilities for implementing constraint-based production scheduling. It supports drum schedule generation, buffer management, and rope release scheduling to maximize throughput while minimizing WIP.
Capabilities
- Drum schedule generation
- Time buffer calculation
- Shipping buffer management
- Constraint buffer monitoring
- Rope release scheduling
- Buffer penetration tracking
- Schedule synchronization
Used By Processes
- TOC-002: Drum-Buffer-Rope Scheduling
- CAP-002: Production Scheduling Optimization
- TOC-001: Constraint Identification and Exploitation
Tools and Libraries
- Production scheduling systems
- ERP integration APIs
- Buffer management tools
- Real-time monitoring platforms
Usage
skill: dbr-scheduler inputs: constraint_resource: "CNC Machine 3" constraint_capacity: 8 # hours per day orders: - order_id: "ORD001" quantity: 100 due_date: "2026-02-15" constraint_time: 2.5 # hours - order_id: "ORD002" quantity: 50 due_date: "2026-02-10" constraint_time: 1.5 buffer_times: constraint_buffer: 2 # days shipping_buffer: 1 # day assembly_buffer: 0.5 # days outputs: - drum_schedule - rope_release_schedule - buffer_status - order_priorities - shipping_dates
DBR Components
Drum
- The schedule for the constraint resource
- Sets the pace for entire system
- Based on customer due dates and constraint capacity
Buffer
- Time protection before constraint (constraint buffer)
- Time protection before shipping (shipping buffer)
- Measured in time, not inventory
Rope
- Release signal for raw materials
- Timed to constraint buffer length
- Prevents excess WIP release
Buffer Management
| Buffer Penetration | Zone | Action |
|---|---|---|
| 0-33% | Green | Normal operation |
| 34-66% | Yellow | Monitor closely |
| 67-100% | Red | Expedite immediately |
Buffer Sizing Guidelines
Constraint Buffer = Production Lead Time x Safety Factor Where: - Production Lead Time = Time from release to constraint - Safety Factor = 1.0-2.0 based on variability
Schedule Synchronization
- Schedule constraint (drum)
- Calculate release dates (rope)
- Set buffer monitoring points
- Communicate shipping commitments
- Monitor buffer penetration
Integration Points
- ERP/MRP systems
- Manufacturing Execution Systems
- Order management systems
- Real-time shop floor data