skills/athola/nm-attune-project-planning/SKILL.mdNight Market Skill — ported from claude-night-market/attune. For the full experience with agents, hooks, and commands, install the Claude Code plugin.
Table of Contents
- When to Use
- Integration
- Planning Phases
- Phase 1: Architecture Design
- Phase 2: Task Breakdown
- Phase 3: Dependency Analysis
- Phase 4: Sprint Planning
- Architecture Design Patterns
- Component Identification
- Component Template
- Component: [Name]
- Task Breakdown Template
- TASK-[XXX]: [Task Name]
- Task Estimation Guidelines
- Dependency Graph
- Sprint Structure
- Sprint [N]: [Focus Area]
- Planned Tasks ([X] story points)
- Deliverable
- Risks
- Dependencies
- Risk Assessment
- Output Format
- Architecture
- System Overview
- Component Diagram
- Components
- Data Flow
- Task Breakdown
- Phase 1: [Name] (Sprint [N]) - TASK-001 through TASK-010
- Phase 2: [Name] (Sprint [M]) - TASK-011 through TASK-020
- Dependency Graph
- Sprint Schedule
- Risk Assessment
- Success Metrics
- Timeline
- Next Steps
- Quality Checks
- Related Skills
- Related Commands
- Examples
Project Planning Skill
Transform specification into implementation plan with architecture design and dependency-ordered tasks.
Delegation
For detailed task planning workflows, this skill delegates to
spec-kit:task-planning as the canonical implementation. Use this skill for quick planning needs; use spec-kit for comprehensive project plans.
When To Use
- After specification phase completes
- Need to design system architecture
- Need task breakdown for implementation
- Planning sprints and resource allocation
- Converting requirements into actionable tasks
- Defining component interfaces and dependencies
When NOT To Use
- No specification exists yet (use
first)Skill(attune:project-specification) - Still exploring problem space (use
instead)Skill(attune:project-brainstorming) - Ready to execute existing plan (use
instead)Skill(attune:project-execution) - Need to adjust running project (update plan incrementally, don't restart)
Integration
With superpowers:
- Uses
for structured planningSkill(superpowers:writing-plans) - Applies checkpoint-based execution patterns
- Uses dependency analysis framework
Without superpowers:
- Standalone planning methodology
- Task breakdown templates
- Dependency tracking patterns
Planning Phases
Phase 1: Architecture Design
Activities:
- Identify system components
- Define component responsibilities
- Design interfaces between components
- Map data flows
- Select technologies
Output: Architecture documentation with diagrams
Phase 1.5: File Structure (REQUIRED)
Activities:
- Map which files will be created or modified
- Assign one-line purpose to each file
- Verify each file has a single clear responsibility
- Lock in decomposition decisions before task breakdown
This phase MUST complete before Phase 2 begins. Tasks reference files declared here; undeclared files require revisiting this phase.
Output: File structure table
Template:
| File | Action | Purpose |
|---|---|---|
| Create | One-line purpose |
| Modify | What changes |
| Delete | Why removed |
Validation:
- Every file in the plan appears in this table
- Every file has exactly one Action (Create/Modify/Delete)
- No file appears twice with different actions
- Purpose describes WHAT, not HOW
Phase 2: Task Breakdown
Activities:
- Decompose FRs into implementation tasks
- Add testing tasks for each FR
- Add infrastructure tasks
- Add documentation tasks
- Estimate each task
Output: Task list with estimates
Phase 3: Dependency Analysis
Activities:
- Identify task dependencies
- Create dependency graph
- Identify critical path
- Detect circular dependencies
- Optimize for parallelization
Output: Dependency-ordered task execution plan
Phase 4: Sprint Planning
Activities:
- Group tasks into sprints
- Balance sprint workload
- Identify milestones
- Plan releases
- Allocate resources
Output: Sprint schedule with milestones
Architecture Design Patterns
Component Identification
Questions:
- What are the major functional areas?
- What concerns should be separated?
- What components can be developed independently?
- What components can be reused?
Common Patterns:
- Frontend/Backend: Separate UI from business logic
- API Layer: Separate interface from implementation
- Data Layer: Separate data access from business logic
- Integration Layer: Isolate external dependencies
Component Template
### Component: [Name] **Responsibility**: [What this component does] **Technology**: [Stack and tools] **Interfaces**: - [Interface 1]: [Description] - [Interface 2]: [Description] **Dependencies**: - [Component 1]: [What's needed] - [Component 2]: [What's needed] **Data**: - [Data structure 1] - [Data structure 2] **Configuration**: - [Config param 1] - [Config param 2]
Task Breakdown Template
### TASK-[XXX]: [Task Name] **Description**: [What needs to be done] **Type**: Implementation | Testing | Documentation | Infrastructure | Deployment **Priority**: P0 (Critical) | P1 (High) | P2 (Medium) | P3 (Low) **Estimate**: [Story points or hours] **Dependencies**: TASK-XXX, TASK-YYY **Sprint**: Sprint N **Assignee**: [Name or TBD] **Linked Requirements**: FR-XXX, NFR-YYY **Acceptance Criteria**: - [ ] [Criterion 1] - [ ] [Criterion 2] - [ ] Tests passing - [ ] Documentation updated **Technical Notes**: - [Implementation detail 1] - [Implementation detail 2] **Testing Requirements**: - Unit tests: [What to test] - Integration tests: [What to test] - E2E tests: [What to test] **Definition of Done**: - [ ] Code complete - [ ] Tests passing - [ ] Code reviewed - [ ] Documentation updated - [ ] Deployed to staging
Task Estimation Guidelines
Story Points (Fibonacci):
- 1 point: < 2 hours, trivial, well-understood
- 2 points: 2-4 hours, straightforward
- 3 points: 4-8 hours, some complexity
- 5 points: 1-2 days, moderate complexity
- 8 points: 2-3 days, significant complexity
- 13 points: 3-5 days, high complexity (consider breaking down)
- 21 points: > 5 days, very complex (MUST break down)
Factors to consider:
- Technical complexity
- Uncertainty/unknowns
- Dependencies on other work
- Testing requirements
- Documentation needs
Dependency Graph
Notation:
TASK-001 (Foundation) ├─▶ TASK-002 (Database schema) │ ├─▶ TASK-003 (Models) │ └─▶ TASK-011 (Data import) └─▶ TASK-004 (Authentication) └─▶ TASK-005 (Auth middleware) └─▶ TASK-010 (Protected endpoints)
Validation:
- No circular dependencies (A depends on B, B depends on A)
- Critical path identified
- Parallel work opportunities identified
- Blocking tasks highlighted
Sprint Structure
Sprint Template:
## Sprint [N]: [Focus Area] **Dates**: [Start] - [End] **Goal**: [Sprint objective] **Capacity**: [Team capacity in story points] ### Planned Tasks ([X] story points) - TASK-XXX ([N] points) - TASK-YYY ([M] points) - ... ### Deliverable [What will be demonstrable at sprint end] ### Risks - [Risk 1 with mitigation] - [Risk 2 with mitigation] ### Dependencies - [External dependency 1] - [External dependency 2]
Risk Assessment
Risk Template:
| Risk | Impact | Probability | Mitigation | |------|--------|-------------|------------| | [Risk description] | High/Med/Low | High/Med/Low | [How to address] |
Common Risks:
- Technology unknowns
- Third-party API dependencies
- Resource availability
- Scope creep
- Performance issues
- Security vulnerabilities
Output Format
Save to
docs/implementation-plan.md:
# [Project Name] - Implementation Plan v[version] **Author**: [Name] **Date**: [YYYY-MM-DD] **Sprint Length**: [Duration] **Team Size**: [Number] **Target Completion**: [Date] ## Architecture ### System Overview [High-level architecture description] ### Component Diagram [ASCII or markdown diagram] ### Components [Component details using template above] ### Data Flow [How data moves through system] ## File Structure | File | Action | Purpose | |------|--------|---------| | [path] | Create/Modify/Delete | [purpose] | ## Task Breakdown ### Phase 1: [Name] (Sprint [N]) - TASK-001 through TASK-010 [Tasks using template above] ### Phase 2: [Name] (Sprint [M]) - TASK-011 through TASK-020 [Tasks using template above] ## Dependency Graph [Dependency visualization] ## Sprint Schedule [Sprint details using template above] ## Risk Assessment [Risk table] ## Success Metrics - [ ] [Metric 1] - [ ] [Metric 2] ## Timeline | Sprint | Dates | Focus | Deliverable | |--------|-------|-------|-------------| | 1 | Jan 3-16 | Foundation | Dev environment | | 2 | Jan 17-30 | Core | Feature X working | ## Next Steps 1. Review plan with team 2. Initialize project with `/attune:project-init` 3. Start execution with `/attune:execute`
Quality Checks
Before completing plan:
- ✅ All architecture components documented
- ✅ File Structure section present before tasks
- ✅ All task files appear in File Structure table
- ✅ All FRs mapped to tasks
- ✅ All tasks have acceptance criteria
- ✅ Dependencies are acyclic
- ✅ Effort estimates provided
- ✅ Critical path identified
- ✅ Risks assessed with mitigations
- ✅ Sprints balanced by capacity
Post-Completion: Workflow Continuation (REQUIRED)
Automatic Trigger: After Quality Checks pass and
docs/implementation-plan.md is saved, MUST auto-invoke the next phase.
When continuation is invoked:
- Verify
exists and is non-emptydocs/implementation-plan.md - Display checkpoint message to user:
Implementation plan complete. Saved to docs/implementation-plan.md. Proceeding to execution phase... - Invoke next phase:
Skill(attune:project-execution)
Bypass Conditions (ONLY skip continuation if ANY true):
flag was provided by the user--standalone
does not exist or is empty (phase failed)docs/implementation-plan.md- User explicitly requests to stop after planning
Do NOT prompt the user for confirmation — this is a lightweight checkpoint, not an interactive gate. The user can always interrupt if needed.
Related Skills
- Planning methodology (if available)Skill(superpowers:writing-plans)
- Task breakdown (if available)Skill(spec-kit:task-planning)
- Previous phaseSkill(attune:project-specification)
- AUTO-INVOKED next phase after planningSkill(attune:project-execution)
- Full lifecycle orchestrationSkill(attune:mission-orchestrator)
Related Commands
- Invoke this skill/attune:blueprint
- Next step in workflow/attune:execute
Examples
See
/attune:blueprint command documentation for complete examples.
Troubleshooting
Common Issues
If you find circular dependencies in your task graph, break one of the tasks into smaller sub-tasks. If sprint capacity is consistently exceeded, re-estimate tasks using the Fibonacci scale or reduce sprint scope.