skills/design/building-a-work-plan/SKILL.mdBuilding a Work Plan
Overview
This skill orchestrates the end-to-end process of converting a design document into an executable work plan. It coordinates branch setup, codebase investigation, milestone-by-milestone planning, and handoff to execution. Think of it as the "conductor" that invokes sub-skills and agents in the right order.
Required Sub-Skills
Load these during execution:
| Skill | Purpose | When Loaded |
|---|---|---|
| writing-a-work-plan | Task decomposition patterns, templates | Phase 2 |
| writing-code | Engineering principles (via writing-a-work-plan) | Phase 2 |
Entry Point
When the user invokes
/build-work-plan:
-
Announce: "I'm using the building-a-work-plan skill to create a work plan from your design document."
-
Get design document path:
- If user provided a path, use it
- If not, use
to request the pathAskUserQuestion - Never guess the path
-
Choose review mode (MANDATORY):
STOP. You MUST get user preference before creating orchestration tasks.
Use
with these options:AskUserQuestion- Interactive (Recommended): Plan one milestone, get approval, proceed. Catches errors early.
- Batch: Plan all milestones, then review all. Faster but riskier.
Record the user's choice. This determines behavior in Phase 2 and Phase 4.
-
Create orchestration tasks (see Task Tracking section)
-
Proceed through phases
Task Tracking
Create these tasks at the start of each session. Update status as you progress.
◻ #1 Setup: Confirm design doc and optional branch setup ◻ #2 Investigate: Codebase testing patterns ◻ #3 Investigate: Design assumptions verification ◻ #4 Plan: Write milestone tasks (one sub-task per milestone) ◻ #5 Verify: Post-planning codebase check ◻ #6 Review: Code review of plan ◻ #7 Approve: User approval ◻ #8 Write: Save plan to disk ◻ #9 Handoff: Execution instructions
Dependencies:
- #2 blocked by #1
- #3 blocked by #2
- #4 blocked by #3
- #5 blocked by #4
- #6 blocked by #5
- #7 blocked by #6
- #8 blocked by #7
- #9 blocked by #8
Use
TaskCreate and TaskUpdate to manage these. Mark each task in_progress when starting, completed when done.
Phases
Phase 0: Setup (Task #1)
Step 1: Confirm design document
Read the design document. Verify it contains:
- Fleshed-out milestones (job stories, descriptions, AC, demos)
- Milestone count ≤ 8
If milestones are vague or missing AC, stop and suggest running
/start-milestone-review first.
Step 2: Optional branch setup
Ask the user:
Do you need to set up a branch for this work? - Yes, create a new branch - No, I'm already on the correct branch
If yes:
- Determine base branch (
ormain
)master - Generate branch name from design doc title (e.g.,
)feat/trackman-scraper - Create and checkout branch:
git checkout -b <branch-name> - Confirm branch created
Mark Task #1 complete.
Phase 1: Codebase Investigation (Tasks #2, #3)
Task #2: Testing patterns
Dispatch
codebase-investigator agent:
Investigate the testing patterns in this codebase: - How are tests structured? (tests/, test/, colocated?) - What testing framework is used? (pytest, jest, etc.) - What mocking patterns exist? - What fixtures are available? - Any test utilities or helpers? Report findings in a structured format.
Document findings. Mark Task #2 complete.
Task #3: Design assumptions (sequential after #2)
Dispatch
codebase-investigator agent:
Verify these design assumptions against the current codebase: Design doc: [path] Milestones: [list milestone titles] Check: - Do files exist where the design expects them? - Do expected features/dependencies exist? - Is there drift between design doc and current code? - What naming conventions should we follow? Report any mismatches or concerns.
Document findings. Mark Task #3 complete.
Phase 2: Milestone Planning (Task #4)
CHECKPOINT: Verify sub-skill is loaded.
Before processing any milestone, confirm you have loaded
writing-a-work-plan skill. If you have not loaded it, STOP and load it now using the Skill tool.
This sub-skill provides:
- Milestone plan header template (Context, Codebase Verification, References)
- Task templates by type (Infrastructure, Functionality, Integration)
- TDD-aligned implementation step patterns
Load sub-skill: Activate
writing-a-work-plan skill.
Process each milestone following the
writing-a-work-plan Core Pattern:
For each milestone M:
-
Create sub-task: "Plan: Milestone M - [title]"
-
Read milestone from design doc
-
Write complete milestone plan header (see
Document Format)writing-a-work-plan -
Classify each AC (infrastructure, functionality, integration)
-
Create scaffold task if needed
-
Create one task per AC with implementation steps
-
If Interactive mode: Use
to get approval:AskUserQuestion- Approve: Milestone plan looks good, proceed to next milestone
- Revise: I have feedback on specific tasks (user provides details via "Other")
Do not proceed until user approves or revisions are complete.
-
Write milestone to disk immediately after approval (enables session recovery)
-
If Batch mode: Continue to next milestone
-
Mark sub-task complete
Mark Task #4 complete when all milestones are planned.
Phase 3: Post-Planning Verification (Task #5)
Dispatch
codebase-investigator agent:
Verify the planned tasks are implementable: Work plan location: [path] Check: - Do target directories exist (or can be created)? - Are import paths valid? - Any conflicts with existing code? - Are test file locations correct? Report any issues that would block implementation.
If issues found:
- Present to user
- Update tasks to match reality, or
- Flag as known issues in the plan
Mark Task #5 complete.
Phase 4: Code Review (Task #6)
This phase is MANDATORY. Do not skip code review.
Even for "simple" plans, code review catches:
- Missing tasks for AC
- Vague verification steps that cause confusion during implementation
- Inconsistent commit message formats
- Dependency ordering issues
Dispatch
code-reviewer agent over all milestone plan files:
Review these work plan files for quality: Files: [list of milestone_##.md files] Check: - All AC have corresponding tasks - Tasks include concrete test code where applicable - Verification steps are explicit - Commit messages follow conventions - Dependencies are noted - No ambiguous or vague steps Report issues by file and task number.
Handle review results based on review mode (chosen in Entry Point step 3):
- Interactive mode: Present issues to user; let user decide what to fix
- Batch mode: Automatically fix issues; user sees clean plan
Verification: Before marking Task #6 complete, confirm:
- Code review agent was dispatched
- All reported issues were addressed (fixed or user-approved as-is)
- Results were presented to user
Mark Task #6 complete.
Phase 5: User Approval (Task #7)
Present the complete work plan summary:
## Work Plan Summary **Design doc**: [path] **Plan location**: [path] **Milestones**: [count] | Milestone | Tasks | Type Breakdown | |-----------|-------|----------------| | M1: [title] | N tasks | X infra, Y func, Z integ | | M2: [title] | N tasks | ... | | ... | ... | ... | **Total tasks**: [count] **Codebase verification**: [status] **Code review**: [status] Ready to write to disk?
Get explicit approval. Mark Task #7 complete.
Phase 6: Write to Disk (Task #8)
Create directory and files using this EXACT structure:
docs/work-plans/YYYY-MM-DD-<plan-name>/ ├── milestone_01.md ├── milestone_02.md ├── ... └── milestone_NN.md
Concrete example (for a plan named "golf-data-loader" on 2026-01-15):
docs/work-plans/2026-01-15-golf-data-loader/ ├── milestone_01.md ├── milestone_02.md ├── milestone_03.md
Naming rules:
- Directory:
where plan-name is lowercase, hyphenatedYYYY-MM-DD-<plan-name> - Files:
,milestone_01.md
, etc. (zero-padded two digits)milestone_02.md - NOT:
,m1-*.md
,M1_*.md
, or any other variantmilestone-1.md
Verification (REQUIRED before marking complete):
ls -la docs/work-plans/YYYY-MM-DD-<plan-name>/
Confirm output shows:
- Directory name matches
formatYYYY-MM-DD-<plan-name> - All files are named
milestone_##.md
Mark Task #8 complete only after verification passes.
Phase 7: Execution Handoff (Task #9)
Capture absolute paths:
git rev-parse --show-toplevel # Working root
Present handoff instructions:
## Work Plan Complete Your work plan is ready at: `[absolute-path-to-plan-directory]` ### Next Steps To execute this work plan:
/execute-work-plan [absolute-path-to-plan-directory]
This will: 1. Read milestones just-in-time (one at a time) 2. Dispatch `code-worker` agents for each task 3. Run code review once per milestone 4. Fix all issues before proceeding to next milestone 5. Provide a full implementation report when complete ### To Resume Later If you need to resume work on this plan in a new session: 1. Run `/clear` to reset context 2. Run `/execute-work-plan [plan-directory-path]` 3. The skill will detect progress and resume from the next incomplete task ### Files Created [List all milestone_##.md files with paths]
Mark Task #9 complete.
Resumption
If the user returns to continue a work plan:
- Ask for the plan directory path
- Read existing milestone files
- Identify which milestones are complete vs pending
- Resume from the next pending milestone
Common Mistakes
| Mistake | Why It Fails | Correct Approach |
|---|---|---|
| Guessing design doc path | Wrong file, wasted effort | Always ask if not provided |
| Skipping review mode choice | User loses control over workflow | AskUserQuestion at session start |
| Skipping codebase investigation | Tasks may not be implementable | Always investigate before planning |
| Not tracking orchestration tasks | Lose progress on interruption | Create tasks at session start |
| Relative paths in handoff | Paths break across sessions | Always use absolute paths |
| Batch planning all milestones | Early mistakes compound | Interactive milestone-by-milestone |
| Skipping code review phase | Plan quality issues compound during implementation | Code review is MANDATORY |
Wrong file naming () | Breaks execution skill expectations | Use format |
| Incomplete milestone headers | Implementers lack context | All header fields are required |
Anti-Rationalizations
- "I know where the design doc is" — Ask anyway. Confirmation prevents errors.
- "Codebase investigation is slow" — It's faster than planning tasks for nonexistent files.
- "Task tracking is overhead" — It's insurance against interruption. Do it.
- "The user knows the paths" — Capture absolute paths explicitly. Context resets.
- "Batch mode is faster" — User loses opportunity to catch early mistakes. Compounding errors cost more than time saved. Ask for their preference.
- "Code review is overkill for a plan" — Plans with issues compound during implementation. A 10-minute review saves hours of debugging.
- "The user will notice the file naming" — They won't until the execution skill fails. Follow the spec exactly.
- "The milestone header is just boilerplate" — It's context for the implementer (human or LLM). Missing context means wrong assumptions.
Summary
- Announce the skill. User knows what's happening.
- Create orchestration tasks. Track progress through phases.
- Investigate before planning. Codebase reality grounds the plan.
- Interactive milestone review. Approve each before proceeding.
- Capture absolute paths. Handoff survives context reset.
- Execution is future work. Plan is the deliverable for now.