Prepare a day-one patch for a game launch. Scopes, prioritises, implements, and QA-gates a focused patch addressing known issues discovered after gold master but before or immediately after public launch. Treats the patch as a mini-sprint with its own QA gate and rollback plan.
git clone https://github.com/Donchitos/Claude-Code-Game-Studios
T=$(mktemp -d) && git clone --depth=1 https://github.com/Donchitos/Claude-Code-Game-Studios "$T" && mkdir -p ~/.claude/skills && cp -r "$T/.claude/skills/day-one-patch" ~/.claude/skills/donchitos-claude-code-game-studios-day-one-patch && rm -rf "$T"
.claude/skills/day-one-patch/SKILL.mdDay-One Patch
Every shipped game has a day-one patch. Planning it before launch day prevents chaos. This skill scopes the patch to only what is safe and necessary, gates it through a lightweight QA pass, and ensures a rollback plan exists before anything ships. It is a mini-sprint — not a hotfix, not a full sprint.
When to run:
- After the gold master build is locked (cert approved or launch candidate tagged)
- When known bugs exist that are too risky to address in the gold master
- When cert feedback requires minor fixes post-submission
- When a pre-launch playtest surfaces must-fix issues after the release gate passed
Day-one patch scope rules:
- Only P1/P2 bugs that are SAFE to fix quickly
- No new features — this is fix-only
- No refactoring — minimum viable change
- Any fix that requires more than 4 hours of dev time belongs in patch 1.1, not day-one
Output:
production/releases/day-one-patch-[version].md
Phase 1: Load Release Context
Read:
— confirm project is in Release stageproduction/stage.txt- The most recent file in
— read the release gate verdictproduction/gate-checks/
— load all bugs with Status: Open or Fixed — Pending Verificationproduction/qa/bugs/*.md
most recent — understand what shippedproduction/sprints/
most recent — check for any open security itemsproduction/security/security-audit-*.md
If
production/stage.txt is not Release or Polish:
"Day-one patch prep is for Release-stage projects. Current stage: [stage]. This skill is not appropriate until you are approaching launch."
Phase 2: Scope the Patch
Step 2a — Classify open bugs for patch inclusion
For each open bug, evaluate:
| Criterion | Include in day-one? |
|---|---|
| S1 or S2 severity | Yes — must include if safe to fix |
| P1 priority | Yes |
| Fix estimated < 4 hours | Yes |
| Fix requires architecture change | No — defer to 1.1 |
| Fix introduces new code paths | No — too risky |
| Fix is data/config only (no code change) | Yes — very low risk |
| Cert feedback requirement | Yes — required for platform approval |
| S3/S4 severity | Only if trivial config fix; otherwise defer |
Step 2b — Present patch scope to user
Use
AskUserQuestion:
- Prompt: "Based on open bugs and cert feedback, here is the proposed day-one patch scope. Does this look right?"
- Show: table of included bugs (ID, severity, description, estimated effort)
- Show: table of deferred bugs (ID, severity, reason deferred)
- Options:
/[A] Approve this scope
/[B] Adjust — I want to add or remove items[C] No day-one patch needed
If [C]: output "No day-one patch required. Proceed to
/launch-checklist." Stop.
Step 2c — Check total scope
Sum estimated effort. If total exceeds 1 day of work:
"⚠️ Patch scope is [N hours] — this exceeds a safe day-one window. Consider deferring lower-priority items to patch 1.1. A bloated day-one patch introduces more risk than it removes."
Use
AskUserQuestion to confirm proceeding or reduce scope.
Phase 3: Rollback Plan
Before any code is written, define the rollback procedure. This is non-negotiable.
Spawn
release-manager via Task. Ask them to produce a rollback plan covering:
- How to revert to the gold master build on each target platform
- Platform-specific rollback constraints (some platforms cannot roll back cert builds)
- Who is responsible for triggering the rollback
- What player communication is required if a rollback occurs
Present the rollback plan. Ask: "May I write this rollback plan to
production/releases/rollback-plan-[version].md?"
Do not proceed to Phase 4 until the rollback plan is written.
Phase 4: Implement Fixes
For each bug in the approved scope, spawn a focused implementation loop:
-
Spawn
via Task with:lead-programmer- The bug report (exact reproduction steps and root cause if known)
- The constraint: minimum viable fix only, no cleanup
- The affected files (from bug report Technical Context section)
-
The lead-programmer implements and runs targeted tests.
-
Spawn
via Task to verify: does the bug reproduce after the fix?qa-tester
For config/data-only fixes: make the change directly (no programmer agent needed). Confirm the value changed and re-run any relevant smoke test.
Phase 5: Patch QA Gate
This is a lightweight QA pass — not a full
/team-qa. The patch is already QA-approved from the release gate; we are only re-verifying the changed areas.
Spawn
qa-lead via Task with:
- List of all changed files
- List of bugs fixed (with verification status from Phase 4)
- The smoke check scope for the affected systems
Ask qa-lead to determine: Is a targeted smoke check sufficient, or do any fixes touch systems that require a broader regression?
Run the required QA scope:
- Targeted smoke check — run
/smoke-check [affected-systems] - Broader regression — run targeted tests in
andtests/unit/
for affected systemstests/integration/
QA verdict must be PASS or PASS WITH WARNINGS before proceeding. If FAIL: scope the failing fix out of the day-one patch and defer to 1.1.
Phase 6: Generate Patch Record
# Day-One Patch: [Game Name] v[version] **Date prepared**: [date] **Target release**: [launch date or "day of launch"] **Base build**: [gold master tag or commit] **Patch build**: [patch tag or commit] --- ## Patch Notes (Internal) ### Bugs Fixed | BUG-ID | Severity | Description | Fix summary | |--------|----------|-------------|-------------| | BUG-NNN | S[1-4] | [description] | [one-line fix] | ### Deferred to 1.1 | BUG-ID | Severity | Description | Reason deferred | |--------|----------|-------------|-----------------| | BUG-NNN | S[1-4] | [description] | [reason] | --- ## QA Sign-Off **QA scope**: [Targeted smoke / Broader regression] **Verdict**: [PASS / PASS WITH WARNINGS] **QA lead**: qa-lead agent **Date**: [date] **Warnings (if any)**: [list or "None"] --- ## Rollback Plan See: `production/releases/rollback-plan-[version].md` **Trigger condition**: If [N] or more S1 bugs are reported within [X] hours of launch, execute rollback. **Rollback owner**: [user / producer] --- ## Approvals Required Before Deploy - [ ] lead-programmer: all fixes reviewed - [ ] qa-lead: QA gate PASS confirmed - [ ] producer: deployment timing approved - [ ] release-manager: platform submission confirmed --- ## Player-Facing Patch Notes [Draft for community-manager to review before publishing] [list player-facing changes in plain language]
Ask: "May I write this patch record to
production/releases/day-one-patch-[version].md?"
Phase 7: Next Steps
After the patch record is written:
- Run
to generate the player-facing version of the patch notes/patch-notes - Run
for each fixed bug after the patch is live/bug-report verify [BUG-ID] - Run
for each verified fix/bug-report close [BUG-ID] - Schedule a post-launch review 48–72 hours after launch using
/retrospective launch
If any S1 bugs remain open after the patch:
"⚠️ S1 bugs remain open and were not patched. These are accepted risks. Document them in the rollback plan trigger conditions — if they occur at scale, rollback may be preferable to a follow-up patch."
Collaborative Protocol
- Scope discipline is everything — resist scope creep; every addition increases risk
- Rollback plan first, always — a patch without a rollback plan is irresponsible
- Deferred is not forgotten — every deferred bug gets a 1.1 ticket automatically
- Player communication is part of the patch —
is a required output, not optional/patch-notes