Aiwg intake-start

Ingest the Project Intake Form and kick off Concept → Inception with agent assignments, accepts optional guidance to tailor process

install
source · Clone the upstream repo
git clone https://github.com/jmagly/aiwg
Claude Code · Install into ~/.claude/skills/
T=$(mktemp -d) && git clone --depth=1 https://github.com/jmagly/aiwg "$T" && mkdir -p ~/.claude/skills && cp -r "$T/.agents/skills/intake-start" ~/.claude/skills/jmagly-aiwg-intake-start && rm -rf "$T"
manifest: .agents/skills/intake-start/SKILL.md
source content

Intake Start (SDLC)

Purpose

IMPORTANT: This command is for teams who have manually crafted their own intake documents (project-intake.md, solution-profile.md, option-matrix.md) and want to validate them before starting the SDLC process.

If you need to generate intake documents, use one of these instead:

  • /intake-wizard "description"
    - Generate intake from scratch with interactive guidance
  • /intake-from-codebase .
    - Generate intake by analyzing existing codebase

This command is NOT required if you used

intake-wizard
or
intake-from-codebase
- those commands produce complete, validated intake forms ready for the next phase.

Task

Given existing, manually-created Project Intake documents:

  1. Process guidance from user prompt (if provided) to tailor analysis
  2. Validate required fields and note gaps
  3. Generate or update phase-plan-inception.md and risk-list.md
  4. Recommend initial ADRs and agent assignments
  5. Hand off to Executive Orchestrator to start Concept → Inception flow

Parameters

  • <path-to-intake-folder-or-form>
    (required): Path to intake directory (default:
    .aiwg/intake/
    )
  • --guidance "text"
    (optional): User-provided context to guide inception planning

Guidance Parameter Usage

The

--guidance
parameter accepts free-form text to help tailor the Inception phase planning. Use it for:

Process Focus:

/intake-start .aiwg/intake/ --guidance "Focus on security architecture first, compliance is critical path"

Risk Priorities:

/intake-start .aiwg/intake/ --guidance "Third-party API integration is biggest unknown, needs spike ASAP"

Team Constraints:

/intake-start .aiwg/intake/ --guidance "Team has limited DevOps experience, need extra support for infrastructure setup"

Stakeholder Expectations:

/intake-start .aiwg/intake/ --guidance "Executive demo required in 2 weeks, need working prototype for fundraising"

Technical Unknowns:

/intake-start .aiwg/intake/ --guidance "Performance at scale unproven, need load testing POC before committing to architecture"

How guidance influences planning:

  • Prioritizes specific risks based on guidance (e.g., "API integration" → elevate integration risks)
  • Tailors agent assignments (e.g., "limited DevOps" → assign DevOps Engineer + provide training resources)
  • Adjusts phase plan (e.g., "demo in 2 weeks" → front-load UI prototype tasks)
  • Highlights critical path items (e.g., "compliance critical" → security gates moved earlier)
  • Documents in phase-plan-inception.md (captures strategic focus and constraints)
  • Recommends spikes/POCs based on unknowns mentioned in guidance

Inputs

  • project-intake.md
    (filled) - Comprehensive system documentation with metadata, architecture, scale, security, team details
  • solution-profile.md
    (filled) - Current profile characteristics, improvement roadmap, risk mitigation, key decisions
  • option-matrix.md
    (filled) - 6-step framework application analysis with priorities and trade-offs

Outputs

  • phase-plan-inception.md
    - Tailored inception plan based on validated intake
  • risk-list.md
    - Prioritized risks with mitigation strategies
  • agent-assignments.md
    - Recommended agent assignments based on project characteristics

Workflow

Step 1: Read and Process Guidance

If

--guidance
parameter provided:

  • Extract guidance text from user prompt
  • Document guidance in notes for later use
  • Use guidance to prioritize validation checks (e.g., "security critical" → focus security validation)

Step 2: Locate and Read Intake Documents

Default location:

.aiwg/intake/
(or user-provided path)

Required files:

  1. project-intake.md
  2. solution-profile.md
  3. option-matrix.md

Error handling:

  • If path is a directory, look for files within it
  • If path is a single file, read it and look for other files in same directory
  • If files missing, report which ones and stop (cannot proceed without complete intake)

Step 3: Validate Project Intake (Comprehensive)

Critical sections to validate (from new comprehensive template):

Metadata Validation

  • Project name present
  • Requestor/owner identified
  • Date present
  • Stakeholders listed (minimum: Engineering, Product)

System Overview Validation

  • Purpose clearly stated (1-2 sentences minimum)
  • Current Status specified (Planning/Development/Early Users/Production)
  • Users defined (count, personas, or description)
  • Tech Stack documented:
    • Languages specified
    • Frontend (if applicable)
    • Backend (if applicable)
    • Database specified
    • Deployment approach specified

Problem and Outcomes Validation

  • Problem statement present (for existing systems) OR goal statement (for greenfield)
  • Outcomes defined (success criteria, key results)

Current Scope and Features Validation

  • Feature list present (minimum 1 feature for MVP+, 3+ for Production)
  • Features categorized or prioritized

Architecture Validation

  • Architectural style specified (monolith/microservices/serverless/etc.)
  • Major components listed (minimum 2-3 for Production+)
  • Data models documented (at least high-level entities)
  • Integration points identified (external APIs, third-party services)

Scale and Performance Validation

  • Expected user capacity documented (even if estimate)
  • Active users estimate provided
  • Performance characteristics specified (response times, throughput, etc.)

Security and Compliance Validation

  • Security posture stated (Minimal/Baseline/Strong/Enterprise)
  • Data classification documented (if handling user data)
  • Security controls listed (authentication, authorization, etc.)
  • Compliance requirements specified (if any: GDPR, HIPAA, SOC2, etc.)

Team and Operations Validation

  • Team size documented (minimum: developer count)
  • Current velocity/cadence noted (for existing teams)
  • Process maturity described (trunk-based, PR workflow, CI/CD, etc.)
  • Operational support plan outlined (on-call, monitoring, etc.)

Dependencies and Infrastructure Validation

  • Third-party services listed (all critical external dependencies)
  • Infrastructure details specified (cloud provider, regions, etc.)

Known Issues and Technical Debt Validation

  • Known risks documented (even if "none identified yet")
  • Technical debt acknowledged (if existing system)

Why This Intake Now? Validation

  • Context provided (why starting SDLC process now)
  • Goals clearly stated
  • Triggers identified (timeline, funding, user need, etc.)

Gap Handling:

  • For critical gaps (no purpose, no tech stack, no team size): STOP and request user fill gaps
  • For moderate gaps (missing performance estimates, unclear compliance): WARN and note in phase plan
  • For minor gaps (missing optional sections): NOTE in validation summary

Step 4: Validate Solution Profile (Comprehensive)

Critical sections to validate (from new comprehensive template):

Profile Selection Validation

  • Profile chosen (Prototype/MVP/Production/Enterprise)
  • Selection rationale provided (explains why this profile fits)

Current State Characteristics Validation

Security:

  • Posture specified (Minimal/Baseline/Strong/Enterprise)
  • Controls present documented
  • Gaps identified
  • Recommendation provided

Reliability:

  • Current SLOs documented (or "N/A" for non-services)
  • Availability targets specified
  • Monitoring maturity described
  • User priority noted (from option-matrix)
  • Recommendation provided (investment areas)

Testing & Quality:

  • Test coverage documented (current percentage)
  • Test types detected/planned
  • Quality gates specified
  • User priority noted
  • Recommendation provided (testing strategy)

Process Rigor:

  • SDLC adoption level documented
  • Code review process described
  • Documentation status assessed
  • Recommendation provided (process improvements)

Recommended Profile Adjustments Validation

  • Current profile stated
  • Recommended profile specified
  • Transition plan outlined (phases with actions and timelines)

Improvement Roadmap Validation

  • Phase 1 (Immediate) defined with critical gaps
  • Phase 2 (Short-term) defined with important improvements
  • Phase 3 (Long-term) defined with strategic improvements
  • Each phase includes: rationale, success metrics

Risk Mitigation Validation

  • Top 3-5 risks identified with:
    • Risk description
    • Impact level (HIGH/MEDIUM/LOW)
    • Mitigation strategies
    • Timeline for mitigation

Key Decisions Needed Validation

  • Critical decisions documented (minimum 1-3 for Production+)
  • Each decision includes:
    • Question framing
    • Options (2-3 alternatives)
    • Recommendation
    • Timeline for decision

Gap Handling:

  • For critical gaps (no profile, no improvement roadmap): STOP and request completion
  • For moderate gaps (missing risk mitigation, unclear decisions): WARN and elevate in phase plan
  • For minor gaps (incomplete success metrics): NOTE in validation summary

Step 5: Validate Option Matrix (Comprehensive)

Critical sections to validate (from new 6-step template):

Step 1: Project Reality Validation

  • What IS This Project? - Clear description (2-3 sentences minimum)
  • Audience & Scale - Target users and scale documented
  • Deployment & Infrastructure - Deployment model specified
  • Technical Complexity - Complexity assessment provided

Step 2: Constraints & Context Validation

  • Resources - Team size, timeline, budget constraints documented
  • Regulatory & Compliance - Requirements specified (or "None")
  • Technical Context - Legacy systems, existing infrastructure noted

Step 3: Priorities & Trade-offs Validation (CRITICAL)

  • Priority Weights table present
  • Weights sum to 1.0 (verify mathematically)
  • Each criterion has rationale:
    • Delivery Speed (0.10-0.50)
    • Cost Efficiency (0.10-0.40)
    • Quality/Security (0.10-0.50)
    • Reliability/Scale (0.10-0.40)
  • Trade-off context provided (explains hard choices)

Priority validation is CRITICAL because it drives:

  • Phase plan task prioritization
  • Agent assignment decisions
  • Quality gate thresholds
  • Risk tolerance levels

Step 4: Intent & Decision Context Validation (CRITICAL)

  • Why This Intake Now? - Clearly stated (business/technical triggers)
  • What decisions need making? - Key decisions identified
  • What's uncertain? - Unknowns acknowledged

Intent validation is CRITICAL because it shapes:

  • Phase plan focus areas
  • Spike/POC recommendations
  • Early ADR topics

Step 5: Framework Application Validation

  • Templates - Checked boxes for applicable templates (or explicit "NONE")
  • Commands - Checked boxes for applicable commands
  • Agents - Checked boxes for applicable agents
  • Process Rigor Level - Specified (Minimal/Moderate/Full/Enterprise)
  • Rationale - Explains why these components selected

Step 6: Evolution & Adaptation Validation

  • Expected Changes - Documented (team growth, feature expansion, etc.)
  • Adaptation Triggers - Specified (when to revisit framework choices)
  • Planned Framework Evolution - Outlined (how framework will evolve with project)

Architectural Options Analysis Validation (Optional but Recommended)

  • Option A documented (if applicable)
  • Option B documented (if applicable)
  • Option C documented (if applicable)
  • Recommendation provided with rationale

Gap Handling:

  • For critical gaps (no Step 3 weights, no Step 4 intent): STOP and request completion
  • For moderate gaps (missing Step 6, incomplete rationale): WARN and use defaults
  • For minor gaps (no architectural options): NOTE (optional section)

Step 6: Generate Validation Summary

Create structured validation report:

# Intake Validation Summary

**Validation Date**: {current date}
**Intake Path**: {path to intake directory}
**Guidance Provided**: {yes/no, summary if provided}

## Completeness Assessment

**Project Intake**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}

**Solution Profile**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}

**Option Matrix**: {COMPLETE | GAPS PRESENT | CRITICAL GAPS}
- {list critical gaps if any}
- {list moderate gaps if any}

## Readiness for Inception

**Status**: {READY | NEEDS COMPLETION | BLOCKED}

**Recommendation**:
- {If READY: proceed to phase planning}
- {If NEEDS COMPLETION: list required actions}
- {If BLOCKED: explain blockers and resolution steps}

## Key Insights from Intake

**Project Profile**: {Prototype/MVP/Production/Enterprise}
**Top Priority**: {from Step 3 weights}
**Biggest Risk**: {from solution-profile risk mitigation}
**Critical Decision**: {from solution-profile key decisions}

## Next Steps

1. {action 1}
2. {action 2}
3. {action 3}

Decision point:

  • If READY: Proceed to Step 7 (Generate Phase Plan)
  • If NEEDS COMPLETION: Output validation summary and STOP (user must complete intake)
  • If BLOCKED: Output validation summary with resolution steps and STOP

Step 7: Generate Phase Plan (Inception)

Create

phase-plan-inception.md
based on validated intake:

Structure:

# Phase Plan: Inception

**Project**: {from project-intake metadata}
**Profile**: {from solution-profile}
**Generated**: {current date}
**Guidance Applied**: {summary of --guidance if provided}

## Phase Overview

**Duration**: {estimate based on profile: Prototype=1-2 weeks, MVP=2-4 weeks, Production=4-6 weeks, Enterprise=6-8 weeks}
**Team Size**: {from project-intake team section}
**Primary Focus**: {derived from option-matrix Step 4 intent}

## Phase Goals

1. **Architectural Foundation**: {from solution-profile improvement roadmap Phase 1}
2. **Risk Retirement**: {from solution-profile risk mitigation top risks}
3. **Team Alignment**: {from project-intake team section}
4. **Decision Making**: {from solution-profile key decisions}

## Priority-Driven Focus

**Top Priority** (from option-matrix Step 3): {highest weighted criterion}
**Implication**: {explain how this priority shapes Inception tasks}

**Examples**:
- If **Reliability/Scale** is top priority → focus architecture scalability, load testing POC, SLO definition
- If **Quality/Security** is top priority → focus security architecture, threat modeling, compliance review
- If **Delivery Speed** is top priority → focus MVP scope definition, technical spikes, rapid prototyping
- If **Cost Efficiency** is top priority → focus cloud cost modeling, resource optimization, vendor selection

## Key Activities (Tailored to Intake)

### Week 1: Foundation
- [ ] Kick-off meeting with stakeholders (from project-intake stakeholders list)
- [ ] Architecture baseline (from project-intake architecture section)
- [ ] Risk register initialization (from solution-profile risk mitigation)
- [ ] Tool and environment setup (from project-intake tech stack)

### Week 2-3: Exploration and Decision Making
- [ ] {activity 1 from solution-profile improvement roadmap Phase 1}
- [ ] {activity 2 from solution-profile key decisions}
- [ ] {spike/POC recommendation if guidance or option-matrix Step 4 mentions unknowns}
- [ ] Initial ADRs (see recommendations below)

### Week 4: Closure and Handoff
- [ ] Architecture review (validate against option-matrix architectural options)
- [ ] Risk reassessment (update risk-list.md)
- [ ] Inception gate check (validate readiness for Elaboration)
- [ ] Handoff to Elaboration (prepare phase-plan-elaboration.md)

## Risks and Mitigation (From Solution Profile)

{Pull top 3-5 risks from solution-profile risk mitigation section}

**Risk 1**: {risk name}
- **Impact**: {HIGH/MEDIUM/LOW}
- **Mitigation**: {strategies from solution-profile}
- **Timeline**: {when to address}

**Risk 2**: {risk name}
- **Impact**: {HIGH/MEDIUM/LOW}
- **Mitigation**: {strategies from solution-profile}
- **Timeline**: {when to address}

{...additional risks}

## Critical Decisions (From Solution Profile)

{Pull from solution-profile key decisions section}

**Decision 1**: {decision question}
- **Options**: {list 2-3 alternatives}
- **Recommendation**: {from solution-profile}
- **Deadline**: {when decision must be made}
- **Owner**: {assign based on decision type}

**Decision 2**: {decision question}
- **Options**: {list 2-3 alternatives}
- **Recommendation**: {from solution-profile}
- **Deadline**: {when decision must be made}
- **Owner**: {assign based on decision type}

{...additional decisions}

## Guidance Integration

{If --guidance provided, document how it influenced this phase plan}

**Guidance Provided**: "{verbatim guidance text}"

**Impact on Phase Plan**:
- {specific adjustment 1 based on guidance}
- {specific adjustment 2 based on guidance}
- {specific adjustment 3 based on guidance}

**Examples**:
- Guidance: "Security architecture first" → Moved threat modeling to Week 1, assigned Security Architect early
- Guidance: "API integration biggest unknown" → Added integration spike to Week 2, elevated API risks
- Guidance: "Team has limited DevOps experience" → Added DevOps Engineer + training resources to agent assignments

## Success Criteria

**Inception complete when**:
1. Architecture baseline documented (ADRs approved)
2. Top 3 risks retired or mitigated
3. Critical decisions resolved
4. Team aligned on approach
5. Inception gate passed (ready for Elaboration)

## Next Phase

**Handoff to**: Elaboration
**Trigger**: Inception gate passed
**Preparation**: Update risk-list.md, generate phase-plan-elaboration.md

Key tailoring points:

  1. Duration scales with profile (Prototype fast, Enterprise slow)
  2. Activities pulled from solution-profile improvement roadmap Phase 1
  3. Risks pulled from solution-profile risk mitigation
  4. Decisions pulled from solution-profile key decisions
  5. Guidance explicitly integrated and documented
  6. Priority focus derived from option-matrix Step 3 weights

Step 8: Generate Risk List

Create

risk-list.md
based on solution-profile risk mitigation:

Structure:

# Risk List

**Project**: {from project-intake metadata}
**Generated**: {current date}
**Last Updated**: {current date}

## Active Risks

{For each risk from solution-profile risk mitigation section}

### Risk #{n}: {Risk Name}

**Category**: {Technical | Process | Resource | External | Compliance}
**Impact**: {HIGH | MEDIUM | LOW}
**Probability**: {HIGH | MEDIUM | LOW}
**Status**: {Identified | Analyzing | Mitigating | Monitoring | Retired}

**Description**: {from solution-profile}

**Impact if Realized**: {from solution-profile impact description}

**Mitigation Strategies**:
1. {strategy 1 from solution-profile}
2. {strategy 2 from solution-profile}
3. {strategy 3 from solution-profile}

**Timeline**: {from solution-profile mitigation timeline}
**Owner**: {assign based on risk category}
**Last Review**: {current date}

---

{Repeat for all risks from solution-profile}

## Risk Register Summary

| ID | Risk Name | Impact | Probability | Status | Owner |
|----|-----------|--------|-------------|--------|-------|
| R1 | {name} | {H/M/L} | {H/M/L} | {status} | {owner} |
| R2 | {name} | {H/M/L} | {H/M/L} | {status} | {owner} |
| ... | ... | ... | ... | ... | ... |

## Risk Burn-down Target

**Inception Phase Goal**: Retire or mitigate top 3 risks
**Elaboration Phase Goal**: Retire or mitigate remaining HIGH risks
**Construction Phase Goal**: Monitor and address emerging risks
**Transition Phase Goal**: All HIGH risks retired or accepted

## Next Review

**Date**: {1-2 weeks from current date}
**Trigger**: Weekly risk review meeting OR significant risk event

Categorization logic:

  • Technical: Architecture, technology choice, integration, performance, scalability
  • Process: Team coordination, code review, testing, deployment
  • Resource: Team size, skill gaps, timeline, budget
  • External: Third-party dependencies, vendor reliability, API changes
  • Compliance: Regulatory requirements, security posture, data protection

Owner assignment logic:

  • Technical risks → Architecture Designer or Component Owner
  • Process risks → Project Manager or Executive Orchestrator
  • Resource risks → Project Manager or Vision Owner
  • External risks → Integration Engineer or API Designer
  • Compliance risks → Security Architect or Legal Liaison

Step 9: Generate Agent Assignments

Create

agent-assignments.md
based on option-matrix Step 5 framework application:

Structure:

# Agent Assignments (Inception Phase)

**Project**: {from project-intake metadata}
**Profile**: {from solution-profile}
**Generated**: {current date}

## Assignment Strategy

**Process Rigor Level**: {from option-matrix Step 5}
**Team Size**: {from project-intake team section}
**Priority Focus**: {from option-matrix Step 3 top weight}

## Core Agents (Always Assigned)

### Executive Orchestrator
**Role**: Lifecycle coordination, gate enforcement, artifact synchronization
**Priority Tasks**:
- Orchestrate Inception phase activities
- Enforce Inception gate criteria
- Coordinate agent handoffs

### Vision Owner
**Role**: Product vision alignment, requirement validation
**Priority Tasks**:
- Validate project-intake alignment with business goals
- Review architectural options against vision
- Approve critical decisions

### Architecture Designer
**Role**: System architecture, technical direction
**Priority Tasks**:
- {from solution-profile improvement roadmap Phase 1 architecture tasks}
- Document ADRs (see recommendations below)
- Review architectural options from option-matrix

## Priority-Driven Agents

{Based on option-matrix Step 3 top priority}

**If Reliability/Scale is top priority**:
- **Reliability Engineer**: Establish SLO/SLI, capacity planning
- **Performance Engineer**: Baseline performance, bottleneck identification
- **DevOps Engineer**: Infrastructure design, monitoring setup

**If Quality/Security is top priority**:
- **Security Architect**: Threat modeling, security requirements
- **Security Gatekeeper**: Security gate criteria, compliance validation
- **Code Reviewer**: Code review standards, quality gates

**If Delivery Speed is top priority**:
- **Software Implementer**: Rapid prototyping, MVP development
- **Test Engineer**: Fast feedback loops, smoke tests
- **Toolsmith**: Developer experience, automation tooling

**If Cost Efficiency is top priority**:
- **Cloud Architect**: Cost modeling, resource optimization
- **DevOps Engineer**: Infrastructure efficiency, right-sizing
- **Integration Engineer**: Vendor selection, API cost analysis

## Risk-Driven Agents

{Based on solution-profile risk mitigation top risks}

**Risk**: {risk 1 name}
**Agent**: {appropriate agent for this risk category}
**Tasks**:
- {mitigation strategy 1}
- {mitigation strategy 2}

**Risk**: {risk 2 name}
**Agent**: {appropriate agent for this risk category}
**Tasks**:
- {mitigation strategy 1}
- {mitigation strategy 2}

{...additional risk-driven assignments}

## Guidance-Driven Agents

{If --guidance provided, assign agents based on guidance context}

**Guidance**: "{verbatim guidance text}"

**Agent Assignments**:
- {agent 1 assigned because of guidance}
- {agent 2 assigned because of guidance}

**Examples**:
- Guidance: "Limited DevOps experience" → Assign DevOps Engineer + provide training resources
- Guidance: "Security critical path" → Assign Security Architect + Security Gatekeeper early
- Guidance: "API integration biggest unknown" → Assign Integration Engineer + API Designer for spike

## Framework-Driven Agents (From Option Matrix Step 5)

{Based on option-matrix Step 5 checked boxes}

**Checked Agents** (from option-matrix):
- {agent 1 from option-matrix rationale}
- {agent 2 from option-matrix rationale}
- {agent 3 from option-matrix rationale}

**Rationale**: {from option-matrix Step 5 rationale section}

## Assignment Timeline

**Week 1** (Inception kickoff):
- Executive Orchestrator (immediate)
- Vision Owner (immediate)
- Architecture Designer (immediate)

**Week 2** (Risk and decision focus):
- {priority-driven agents}
- {risk-driven agents}

**Week 3-4** (As needed):
- {additional agents based on emerging needs}

## Handoff to Elaboration

**Agents continuing into Elaboration**:
- Executive Orchestrator (lifecycle coordination)
- Architecture Designer (architecture evolution)
- {priority-driven agents that remain relevant}

**Agents completing in Inception**:
- {agents whose work ends after Inception}

**New agents for Elaboration**:
- {agents not needed until Elaboration phase}

Agent selection logic:

  1. Core agents (always): Executive Orchestrator, Vision Owner, Architecture Designer
  2. Priority-driven (from option-matrix Step 3 weights): Match top priority to specialized agents
  3. Risk-driven (from solution-profile risks): Assign agents who can mitigate specific risks
  4. Guidance-driven (from --guidance parameter): Assign agents mentioned or implied by guidance
  5. Framework-driven (from option-matrix Step 5): Assign checked agents from framework application

Step 10: Generate Initial ADR Recommendations

Within phase-plan-inception.md, include section:

## Recommended Initial ADRs

{Based on project-intake architecture section, option-matrix architectural options, and solution-profile key decisions}

**ADR-001**: {Decision title from option-matrix architectural options recommendation}
- **Context**: {from option-matrix Step 1 project reality}
- **Decision**: {from option-matrix architectural options recommendation}
- **Rationale**: {from option-matrix recommendation rationale}
- **Status**: Proposed (to be reviewed in Week 2)

**ADR-002**: {Decision title from solution-profile key decisions}
- **Context**: {from solution-profile decision question}
- **Decision**: {from solution-profile recommendation}
- **Rationale**: {from solution-profile recommendation}
- **Status**: Proposed (to be reviewed in Week 2-3)

{Additional ADRs based on guidance or high-impact risks}

**Guidance**: If guidance mentions specific technical decisions or unknowns, recommend ADRs to address them.

Step 11: Summary and Handoff

Output summary message to user:

# Intake Start Complete

✅ **Validation**: All intake documents validated
✅ **Phase Plan**: phase-plan-inception.md generated
✅ **Risk List**: risk-list.md generated
✅ **Agent Assignments**: agent-assignments.md generated

## Key Insights

**Project**: {name}
**Profile**: {profile}
**Top Priority**: {priority}
**Biggest Risk**: {risk}
**Critical Decision**: {decision}

## Generated Artifacts

1. `phase-plan-inception.md` - {file size} KB
2. `risk-list.md` - {file size} KB
3. `agent-assignments.md` - {file size} KB

## Next Steps

1. **Review** generated artifacts (ensure alignment with expectations)
2. **Adjust** if needed (especially if guidance interpretation missed nuances)
3. **Execute** Inception phase using `/flow-concept-to-inception` command
4. **Coordinate** with assigned agents (Executive Orchestrator will orchestrate)

## Ready to Start?

To begin Inception phase execution:
```bash
/flow-concept-to-inception .aiwg/

This will activate the Executive Orchestrator and assigned agents to begin Inception activities.


## Error Handling

### Missing Files
- If project-intake.md missing: **STOP** - "Cannot proceed without project-intake.md. Please run /intake-wizard or /intake-from-codebase first."
- If solution-profile.md missing: **STOP** - "Cannot proceed without solution-profile.md. Please complete intake generation first."
- If option-matrix.md missing: **WARN** - "option-matrix.md missing. Will use defaults for priorities and framework application."

### Incomplete Sections
- If critical gaps found: **STOP** with validation summary - user must complete gaps before proceeding
- If moderate gaps found: **WARN** in validation summary - proceed with noted gaps
- If minor gaps found: **NOTE** in validation summary - proceed normally

### Conflicting Information
- If project-intake and solution-profile conflict (e.g., different team sizes): **WARN** and use project-intake as source of truth
- If option-matrix and solution-profile priorities conflict: **WARN** and use option-matrix Step 3 weights as source of truth

### Invalid Data
- If option-matrix Step 3 weights don't sum to 1.0: **STOP** - "Priority weights must sum to 1.0. Current sum: {calculated sum}. Please fix option-matrix.md."
- If profile not one of (Prototype/MVP/Production/Enterprise): **STOP** - "Invalid profile: {profile}. Must be one of: Prototype, MVP, Production, Enterprise."

## Best Practices

1. **Always validate before generating** - Don't generate phase plans from incomplete intake
2. **Leverage guidance parameter** - Use guidance to prioritize and tailor (don't ignore user's strategic intent)
3. **Be explicit about gaps** - Don't silently fill gaps with assumptions (warn user and document)
4. **Cross-reference documents** - Pull risks from solution-profile, priorities from option-matrix, architecture from project-intake
5. **Tailor to profile** - Prototype gets lightweight plan, Enterprise gets comprehensive plan
6. **Document guidance impact** - Explicitly show how guidance influenced phase plan (transparency builds trust)

## Star the Repository

After successfully validating and generating phase plans, offer the user an opportunity to star the repository:

**Prompt**:

The AIWG is an open-source project that helps improve AI-generated content. If you found this helpful, would you like to star the repository on GitHub?

Options:

  • Yes, star the repo
  • No thanks

**If user selects "Yes, star the repo"**:

1. Check if `gh` CLI is available:
   ```bash
   which gh
  1. If

    gh
    is available, attempt to star:

    gh api -X PUT /user/starred/jmagly/ai-writing-guide
    
    • If successful: "⭐ Thank you for starring the AIWG! Your support helps the project grow."
    • If fails: "Could not star via gh CLI. You can star manually at: https://github.com/jmagly/aiwg"
  2. If

    gh
    is not available:

    GitHub CLI (gh) not found. You can star the repository at:
    https://github.com/jmagly/aiwg
    

If user selects "No thanks":

No problem! Thanks for using the AIWG.

References

  • @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/human-authorization.md — Stop and await user action when critical gaps are found; never silently fill required fields
  • @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/instruction-comprehension.md — Process the --guidance parameter fully before tailoring phase plan; do not ignore strategic intent
  • @$AIWG_ROOT/agentic/code/addons/aiwg-utils/rules/vague-discretion.md — Phase plan completion criteria must be concrete (artifacts present, weights sum to 1.0, not "good enough")
  • @$AIWG_ROOT/agentic/code/frameworks/sdlc-complete/skills/project-status/SKILL.md — Use after intake-start completes to confirm phase and next steps
  • @$AIWG_ROOT/agentic/code/frameworks/sdlc-complete/skills/orchestrate-project/SKILL.md — Hands off to orchestrator once intake validation and planning artifacts are generated