skills/data/beads-plan/SKILL.mdBeads Planning Skill
What This Skill Does
This skill guides the transformation of project specifications into instantiated beads dependency graphs. A well-planned beads implementation creates an executable DAG (directed acyclic graph) where each bead (issue) has clear boundaries, explicit inputs/outputs, and testable success criteria.
Integration with Org-mode Planning Layer
Beads operates as the execution layer in a layered planning architecture:
┌─────────────────────────────────────────────┐ │ PLANNING LAYER (Org-mode) │ │ - Human-visible project state │ │ - Strategic decomposition │ └─────────────────────────────────────────────┘ │ [spawn-to-beads: Task Spawns Epic] ▼ ┌─────────────────────────────────────────────┐ │ EXECUTION LAYER (Beads) ← YOU ARE HERE │ │ - Agent-executable decomposition │ │ - Swarm coordination and claiming │ └─────────────────────────────────────────────┘ │ [complete-to-org: Epic Completes] ▼ ┌─────────────────────────────────────────────┐ │ PLANNING LAYER (Org-mode) - State Updated │ └─────────────────────────────────────────────┘
Key Integration Points:
- Epics may be spawned from org-mode tasks via
skillspawn-to-beads - Such epics have a
reference in their descriptionsource_org_id - When these epics complete,
skill updates the source org taskcomplete-to-org
What Beads Planning Offers
- Explicit dependency graph - Forces architectural clarity upfront
- Bounded units - Each bead has clear inputs/outputs/success criteria
- Parallelization - Independent beads can execute concurrently
- Integration contracts - Boundaries are explicit and testable
- Fault isolation - One bead's failure doesn't corrupt others
- Ready work detection -
shows unblocked workbd ready - Progress visibility - Dependency tree shows completion state
Prerequisites
CLI installed (bd
ornpm install -g @beads/bd
)brew install steveyegge/beads/bd- Repository initialized with
(run once per project)bd init - Working directory is within a git repository
- For iterative changes: Planning Context Snapshot recommended (see
skill)iterative-planning-context
Quick Start
For a simple project, the workflow is:
# 1. Create the epic (top-level container) bd create "My Project Epic" -t epic -p 1 -d "Description of the overall goal" # 2. Create tasks as children of the epic (auto-generates hierarchical IDs) bd create "First task" -t task -p 2 --parent bd-XXXX bd create "Second task" -t task -p 2 --parent bd-XXXX # 3. Add blocking dependencies between tasks bd dep add bd-XXXX.2 bd-XXXX.1 # Task 2 depends on Task 1 # 4. Validate the plan bd ready # Should show Task 1 as ready bd dep tree bd-XXXX # Visualize the dependency graph bd dep cycles # Should return empty (no cycles)
For complex projects, follow the five phases below. The phases are internal reasoning steps—work through them continuously and present the instantiated result. Only pause for user input when the specification has genuine ambiguity that blocks progress.
Spawned Epics (from Org-mode)
When an epic is created via the
spawn-to-beads skill from an org-mode task, special handling applies:
Identifying Spawned Epics
Spawned epics include a source reference in their description:
# Epic created with source reference bd create "Implement Authentication" -t epic -p 1 \ -d "[source_org_id: task-implement-auth] Full description here..."
The
source_org_id marker links this epic back to the originating org-mode task.
Completion Callback Protocol
When closing an epic that has a
source_org_id:
-
Check for source reference in epic description:
bd show <epic-id> --json | jq -r '.description' | grep -o 'source_org_id: [^]]*' -
Verify 100% completion (all child beads closed):
bd epic status <epic-id> -
Trigger complete-to-org skill to update the org-mode task:
- The org task transitions from WAITING to DONE
- The DELEGATED_TO property may be cleared or annotated
-
Then close the epic:
bd close <epic-id> -r "All tasks complete. Org task updated."
Important: Always trigger the org callback BEFORE closing the epic, so the source reference is still accessible.
Non-Spawned Epics
Epics created directly (without org source) follow normal workflow with no callback required.
However, direct epic creation violates org-mode coherence. See "Org-Mode Coherence" section below.
Org-Mode Coherence
Architectural Principle: Org-mode is the canonical planning layer. All work SHOULD originate from org-mode.
Why Coherence Matters
When epics are created without org source:
- Planning layer (org-mode) doesn't reflect actual work
- No bidirectional traceability
- Weekly reviews miss work in progress
- Completion callbacks cannot update planning state
Creating Epics
RECOMMENDED: Spawn from org-mode
Use
spawn-to-beads skill to create epic from org task:
# 1. Have org task ready # 2. Use spawn-to-beads skill (establishes bidirectional refs) # 3. Result: epic has source_org_id, org task has DELEGATED_TO
TACTICAL EXCEPTION: Direct creation
Creating epics directly is permitted but produces a warning:
# Before: bd create "Epic Title" -t epic -p 1 -d "Description" # # Ask yourself: # - Is this genuinely ad-hoc work? # - Should an org task exist for this work? # - Will I remember to update org-mode when complete? # # If creating without org source, acknowledge the deviation: echo "WARNING: Creating epic without org source. Org-mode coherence violated."
Coherence Check (Phase 4)
During instantiation, before creating the epic:
- Check for org source: Does this work have an org task?
- If yes: Use
skill instead of direct creationspawn-to-beads - If no:
- Consider creating org task first (recommended)
- Or proceed with warning (tactical exception)
Retroactive Sync
If an epic was created without org source and should be tracked:
- Create corresponding org task in appropriate project
- Set org task to WAITING state
- Add
property pointing to existing epic IDDELEGATED_TO - Edit epic description to include
marker[source_org_id: <org-id>]
This restores bidirectional traceability but is more work than doing it right initially.
Context-Aware Planning (Iterative Changes)
When planning changes to an existing codebase (vs greenfield), leverage Planning Context Snapshots for better decomposition.
Check for Existing Context
Before starting Phase 1, check if a Planning Context Snapshot exists:
ls docs/planning/context-*.md 2>/dev/null
If found, read it first - it contains:
- Structure Map: Where new code should live
- Conventions: Patterns to follow (naming, error handling, tests)
- Integration Points: What existing code to touch
- Core Abstractions: Types/traits to extend or use
Using Context During Decomposition
Phase 1 Enhancement - Use context to:
- Verify scope against documented structure
- Identify integration points from context rather than exploring
- Check for existing planning state (related work, blockers)
Phase 2 Enhancement - Use context for better beads:
- Match file locations to "Adding New Code" table
- Follow documented naming conventions in bead titles
- Reference existing patterns in acceptance criteria
- Add integration beads for documented touch points
Phase 3 Enhancement - Use context for dependencies:
- Dependencies on documented integration points become explicit beads
- Test patterns inform test bead structure
- Build/deploy patterns inform chore beads
Context-Informed Bead Anatomy
When context exists, beads should reference it:
| Field | Context Enhancement |
|---|---|
| Title | Use naming conventions from context |
| Description | Reference location from structure map |
| Acceptance | Include pattern compliance from conventions |
Example with context:
# Context says: new commands go in commands/<name>.rs, follow init.rs pattern bd create "Add export command" -t task -p 2 --parent bd-XXXX \ -d "Create commands/export.rs following init.rs pattern. See context-beadsmith.md §Structure Map." \ --acceptance "Command works, tests in #[cfg(test)] module, error handling uses anyhow::Result with .context()"
Acquiring Context When Missing
If no Planning Context Snapshot exists and the change is non-trivial:
- For minor changes: Proceed with Phase 1 exploration
- For major changes: Use
skill first to generate contextiterative-planning-context - Save context: Output to
for future usedocs/planning/context-<project>.md
Context Staleness
Planning Context Snapshots include staleness warnings. If context is stale:
- For structural info (directory layout): Verify before relying on it
- For patterns: Sample a recent file to confirm conventions haven't changed
- For integration points: May need refresh if major changes occurred
Phase 1: Understanding
Goal: Fully understand the project scope before decomposing.
Key Determinations
Before creating any beads, establish clarity on:
- Scope: What is the deliverable? What is explicitly out of scope?
- Success criteria: How will we know when the project is complete?
- Constraints: Timeline, technology stack, external dependencies?
- Risks: What could go wrong? What's uncertain?
- Stakeholders: Who needs to review or approve?
Identifying Natural Boundaries
Look for natural decomposition points:
- Functional boundaries: Different capabilities (auth, data, UI)
- Data boundaries: Different data domains or storage systems
- Interface boundaries: API contracts between components
- Deployment boundaries: Services that deploy independently
- Team boundaries: Work that different people/agents would own
Surfacing Hidden Dependencies
Identify non-obvious blockers:
- External services or APIs to integrate
- Data migrations or schema changes
- Infrastructure provisioning
- Documentation or compliance requirements
- Testing environments or fixtures
Output of Phase 1
A clear mental model of:
- The project's overall structure
- 3-7 major components or phases
- Known dependencies between them
- Risks that need mitigation beads
Phase 2: Decomposition
Goal: Break work into bounded units (beads) with clear definitions.
Bead Anatomy
Every bead must have:
| Field | Description | Example |
|---|---|---|
| Title | Clear, action-oriented | "Implement user authentication API" |
| Type | epic, feature, task, bug, chore | |
| Priority | P0 (critical) to P4 (backlog) | |
| Description | What and why | |
| Acceptance criteria | Testable success conditions | |
Type Selection Guide
| Type | Use When | Typical Children |
|---|---|---|
| epic | Container for related work, multi-week effort | features, tasks |
| feature | User-visible capability, days to a week | tasks |
| task | Single unit of work, hours to a day | none or sub-tasks |
| bug | Defect fix | none |
| chore | Maintenance, refactoring, tooling | none |
Priority Mapping
| Priority | Meaning | Use When |
|---|---|---|
| P0 | Critical/Blocker | Must be done immediately, blocks everything |
| P1 | High | Core functionality, needed for MVP |
| P2 | Medium | Important but not blocking (default) |
| P3 | Low | Nice to have, polish |
| P4 | Backlog | Future consideration |
Granularity Rules
Too Large (split it):
- Takes more than 2-3 days
- Has multiple distinct deliverables
- Would benefit from partial completion visibility
- Different skills or contexts needed for different parts
Too Small (merge it):
- Takes less than 30 minutes
- Has no independent value
- Always done together with another task
- Creates noise in the dependency graph
Just Right:
- Clear single deliverable
- Independently testable
- Can be claimed and completed in one session
- Dependencies are obvious and minimal
Bead Quality Criteria (CRITICAL)
The planning context window is precious. When you plan, you have full visibility into requirements, research, and design decisions. That knowledge must be encoded into the bead, not left implicit.
A poorly-specified bead forces the executing agent to re-discover domain knowledge, make assumptions about intent, and produce work that technically passes but misses the point.
See
docs/bead-quality-criteria.md for the complete specification. Key requirements:
1. Description Encodes Domain Knowledge
Bad: "Create the vision-workshop skill for guided vision creation."
Good: "Create skills/vision-workshop/input.yaml implementing the Product Vision Board methodology (Roman Pichler) for co-creative vision document creation. Workflow phases: 1) North Star, 2) Target Users, 3) Core Problem, 4) Value Proposition, 5) Standout Capabilities, 6) Success Criteria, 7) Anti-Goals, 8) Synthesis. Reference: skills/org-planning/input.yaml for structure pattern."
Test: Could an agent with NO prior context execute this bead and produce the intended result?
2. Acceptance Criteria Are Behavioral, Not Mechanical
Acceptance criteria should verify that the bead achieves its purpose, not just that artifacts exist or code was written.
Common anti-pattern: Mechanism-vs-Purpose confusion
For a bead about "per-bead context isolation":
Bad (verifies mechanism):
1. Function get_next_ready_bead() exists 2. Session persistence code removed 3. CONTEXT.md file created before each bead
Good (verifies purpose):
1. Run harness on 2-bead epic: opencode session list shows 2 distinct sessions 2. Bead 2 cannot reference variables/decisions from Bead 1's context 3. CONTEXT.md timestamps differ between beads (stat shows different mtime)
The bad criteria verify that changes were made. The good criteria verify that isolation actually works.
More examples by bead type:
| Bead Type | Mechanical (bad) | Behavioral (good) |
|---|---|---|
| File migration | "Files moved to new location" | "grep shows all references use new paths" |
| New function | "Function exists in module" | "Calling function with X input produces Y output" |
| Refactor | "Code restructured per plan" | "All existing tests still pass + new behavior verified" |
| Config change | "Config file updated" | "System behavior changes as expected when config applied" |
Test: Do the acceptance criteria verify PURPOSE, not just EXISTENCE?
3. References Are Concrete
Bad: "Follow existing patterns in the codebase."
Good: "Follow the pattern in skills/org-planning/input.yaml: workflow section with phases/steps/outputs, patterns section, antipatterns section, checklist section, examples section."
4. Scope Is Bounded
Every bead should have implicit or explicit in-scope/out-of-scope. If scope is ambiguous, make it explicit in the description.
Quality Checklist (verify before finalizing each bead):
- Domain knowledge encoded (methodologies, constraints, key decisions)
- Behavioral acceptance criteria (verify purpose, not just existence)
- Concrete references (file paths, line numbers, pattern examples)
- Bounded scope (in-scope and out-of-scope explicit if ambiguous)
- Observable success (verification steps are concrete)
Decomposition Patterns
Top-Down: Start with epic, break into features, break into tasks
Epic: Build Authentication System Feature: User Registration Task: Create registration form Task: Implement email validation Task: Add password strength checker Feature: Login Flow Task: Create login form Task: Implement JWT generation Task: Add session management
Horizontal Layers: Decompose by system layer
Epic: Add Search Feature Task: Design search API contract Task: Implement search backend Task: Create search UI component Task: Add search result caching Task: Write integration tests
Vertical Slices: End-to-end thin slices
Epic: User Dashboard Task: Basic dashboard with user info (full stack) Task: Add activity feed (full stack) Task: Add settings panel (full stack)
Integration & Synthesis Beads (REQUIRED for multi-component epics)
When an epic has multiple features or components that must work together, you MUST add integration beads as leaf nodes in the DAG. These execute last (after all feature beads) and ensure the system works as a coherent whole.
Why Integration Beads Are Necessary:
- Each agent optimizes locally for its bead
- Agents produce documentation that only describes their piece
- Cross-component contracts can drift silently
- No agent has the full picture without explicit integration tasks
Standard Integration Beads:
For any epic with 2+ features, add:
Feature: Integration & Documentation (P3 - depends on all other features) Task: Documentation synthesis - Generate unified README from spec + all component implementations - Ensure docs tell the complete story, not just one piece - Acceptance: README covers full system architecture, setup, and usage Task: Cross-component verification - Verify API contracts match between client and server - Run end-to-end tests across component boundaries - Acceptance: E2E test passes: data flows through entire system Task: Deployment documentation - Verify deployment docs cover full stack (not just one component) - Acceptance: New developer can deploy entire system from docs
Dependency Pattern:
Integration beads use fan-in - they depend on ALL feature beads:
# Integration depends on all features bd dep add bd-integration bd-feature1 bd dep add bd-integration bd-feature2 bd dep add bd-integration bd-feature3
This ensures integration beads naturally execute last, after all components are built.
Example: Multi-Component App
Epic: Oracy MVP Feature: Server Core (P1) └── [server tasks...] Feature: Mobile Core (P1) └── [mobile tasks...] Feature: Integration & Documentation (P3) ├── Task: Write unified README from spec + implementations ├── Task: Verify mobile API client matches server OpenAPI spec ├── Task: E2E test: record audio → upload → transcript appears └── Task: Verify deployment docs cover full stack
When to Skip Integration Beads:
- Single-component epics (no cross-component boundaries)
- Pure refactoring epics (no new functionality to document)
- Bug-fix epics (no integration surface changed)
Do NOT skip integration beads just because they're "P3" - they're P3 because they must run last, not because they're optional.
Phase 3: Dependency Mapping
Goal: Establish relationships between beads.
Dependency Types
| Type | Semantics | Use When | Command |
|---|---|---|---|
| blocks | A must complete before B starts | Sequential work, technical dependency | |
| parent-child | Hierarchical containment | Epic contains features/tasks | |
| related | Soft connection, informational | Related but independent work | |
| discovered-from | Work found during other work | Bug found while implementing feature | |
Dependency Decision Tree
Is B inside A (containment)? YES -> parent-child (use --parent on create) NO -> Continue... Must A complete before B can start? YES -> blocks (bd dep add B A) NO -> Continue... Was B discovered while working on A? YES -> discovered-from (bd dep add B A -t discovered-from) NO -> Continue... Are A and B related but independent? YES -> related (bd dep add A B -t related) NO -> No dependency needed
Blocking Dependency Patterns
Sequential Chain:
# A -> B -> C (A blocks B, B blocks C) bd dep add bd-B bd-A bd dep add bd-C bd-B
Fan-Out (one blocks many):
# Setup blocks all implementation tasks bd dep add bd-impl1 bd-setup bd dep add bd-impl2 bd-setup bd dep add bd-impl3 bd-setup
Fan-In (many block one):
# All features must complete before release bd dep add bd-release bd-feature1 bd dep add bd-release bd-feature2 bd dep add bd-release bd-feature3
Diamond (convergent paths):
# A -> B, A -> C, B -> D, C -> D bd dep add bd-B bd-A bd dep add bd-C bd-A bd dep add bd-D bd-B bd dep add bd-D bd-C
Detecting Cycles Before Instantiation
Before adding dependencies, mentally trace the graph:
- Can I reach A from A by following dependencies? If yes, cycle exists.
- Draw it out if complex.
After instantiation, verify:
bd dep cycles # Should return empty
Phase 4: Instantiation
Goal: Create the beads in the correct order with proper relationships.
Order of Creation
- Epics first (top of hierarchy)
- Features (with
pointing to epic)--parent - Tasks (with
pointing to epic or feature)--parent - Dependencies (after all beads exist)
Coherence Check (Before Creating Epic)
Before creating the epic, verify org-mode coherence:
-
Does this work have an org task?
- If YES → Use
skill instead (see "Spawned Epics" section)spawn-to-beads - If NO → Continue, but acknowledge the deviation
- If YES → Use
-
If proceeding without org source:
# Acknowledge coherence violation (tactical exception) echo "NOTE: Creating epic without org source - ensure org-mode is updated when complete"
Creating Epics
With org source (RECOMMENDED):
# Use spawn-to-beads skill - it creates epic with source_org_id # and updates org task with DELEGATED_TO property
Without org source (TACTICAL EXCEPTION):
bd create "Project Epic Title" \ -t epic \ -p 1 \ -d "High-level description of the project goal" \ --acceptance "All child features complete, tests passing, docs updated"
Capture the returned ID (e.g.,
bd-a3f8).
Creating Child Tasks with Hierarchical IDs
# Using --parent auto-generates hierarchical IDs: bd-a3f8.1, bd-a3f8.2, etc. bd create "First task" -t task -p 2 --parent bd-a3f8 \ -d "Description of what this task accomplishes" \ --acceptance "Specific testable criteria" bd create "Second task" -t task -p 2 --parent bd-a3f8 \ -d "Description" \ --acceptance "Criteria"
Adding Dependencies
After all beads are created:
# Task 2 depends on Task 1 (Task 1 blocks Task 2) bd dep add bd-a3f8.2 bd-a3f8.1 # Task 3 depends on Task 2 bd dep add bd-a3f8.3 bd-a3f8.2 # Final task depends on multiple tasks (fan-in) bd dep add bd-a3f8.5 bd-a3f8.3 bd dep add bd-a3f8.5 bd-a3f8.4
Batch Creation from Markdown
For larger plans, create a markdown file:
# Project Plan ## Epic: Authentication System - Type: epic - Priority: 1 - Description: Implement complete auth system ### Task: Design API contract - Type: task - Priority: 1 - Blocks: Implement auth endpoints ### Task: Implement auth endpoints - Type: task - Priority: 2
Then:
bd create -f plan.md
Phase 5: Validation
Goal: Verify the dependency graph is complete, correct, and executable.
Validation Checklist
0. Bead Quality Gate (REQUIRED)
Before structural validation, verify each bead meets quality criteria:
# Check description length (guards against thin beads) bd list --parent $EPIC_ID --json | jq -e ' [.[] | select((.description | length) < 100)] | if length > 0 then "QUALITY FAIL: Thin descriptions on: \([.[].id] | join(", "))" | halt_error else empty end ' # Check acceptance criteria count (minimum 2 criteria per bead) # Note: This guards against missing/thin criteria but cannot detect mechanical-vs-behavioral. # The planner must self-audit for behavioral criteria using the test: "Does this verify PURPOSE?" bd list --parent $EPIC_ID --json | jq -e ' [.[] | select( .acceptance_criteria == null or (.acceptance_criteria | split("\n") | map(select(length > 0)) | length) < 2 )] | if length > 0 then "QUALITY FAIL: Insufficient acceptance criteria on: \([.[].id] | join(", "))" | halt_error else empty end '
Quality Failures Are Hard Stops. Do not proceed to execution with thin beads.
Remediation: For each failing bead:
- Ask: "What domain knowledge does the executor need that I have right now?"
- Encode that knowledge into the description
- Ask: "How will we verify this achieves its PURPOSE, not just exists?"
- Add behavioral acceptance criteria
1. Ready Work Exists
bd ready
Expected: At least one bead with status
open and no blockers.
If empty: Check for cycles or missing root tasks.
2. No Cycles
bd dep cycles
Expected: Empty output (no cycles detected).
If cycles found: Remove one edge to break the cycle.
3. Dependency Tree is Coherent
bd dep tree bd-EPIC-ID
Expected: All tasks appear in the tree, logical ordering.
Check for:
- Orphaned beads (not connected to epic)
- Missing dependencies (parallel tasks that should be sequential)
- Over-connected graph (unnecessary dependencies)
4. Visualize Execution Order
bd graph bd-EPIC-ID
Expected: ASCII visualization showing layers:
- Layer 0: No dependencies (start here)
- Higher layers: Depend on lower layers
- Same layer: Can run in parallel
5. Epic Status
bd epic status bd-EPIC-ID
Expected: Shows completion percentage and blocked/ready counts.
Orphan Detection
List all beads and verify each is either:
- A root epic, OR
- Has a
relationship, OR--parent - Has at least one
orblocks
dependencyrelated
bd list --all --json | jq '.[] | select(.parent == null and .dependencies == [])'
Planning Complete: Handoff to Execution
Phase 5 is the END of the beads-plan skill's responsibility.
After validation passes, the planning agent outputs a handoff message and STOPS:
Planning complete. Epic: <epic-id> Branch: <branch-name> Work Type: <type> Beads: <count> tasks ready for execution To execute: beads-harness <epic-id>
The planning agent MUST NOT execute beads. Execution is a separate phase with a separate agent (the
beads-harness). This separation ensures:
-
Beads are self-contained - If the planning agent could execute, beads might rely on conversational context that isn't encoded in the bead description.
-
Execution is scalable - The harness can parallelize across multiple agents. Manual execution cannot.
-
Recovery is possible - If execution fails, the plan remains intact for retry.
See
docs/bead-quality-criteria.md § "Planning/Execution Boundary" for details.
Exception: The planning agent may execute only if the user explicitly requests it (e.g., "execute the first bead now").
Swarm Execution Guidance
Note: This section documents how the
and execution agents work. It is reference material, not actions for the planning agent to perform.beads-harness
When multiple agents work on the same beads project, coordination is essential.
Agent Workflow
-
Find ready work:
bd ready --json -
Claim a bead (atomic operation):
bd update bd-XXXX --claimThis atomically sets
andstatus=in_progress
. Fails if already claimed.assignee=<agent> -
Work on the bead: Implement the task.
-
Complete the bead:
bd close bd-XXXX -r "Completed: brief summary" -
Sync changes:
bd sync -
Check for newly unblocked work:
bd ready --json
Status Transitions
open -> in_progress (via --claim or --status in_progress) in_progress -> closed (via bd close) closed -> open (via bd reopen, if needed)
Avoiding Conflicts
- Always claim before working: Never work on unclaimed beads
- Sync frequently: Run
before and after work sessionsbd sync - Use JSON output:
flag for programmatic parsing--json - Check assignee:
bd show bd-XXXX --json | jq '.assignee'
Multi-Agent Patterns
Round-Robin: Each agent queries
bd ready, claims the first unclaimed bead.
Specialized Agents: Filter by label:
bd ready --label backend vs bd ready --label frontend
Priority-Based: Sort by priority:
bd ready --sort priority
Worked Example: CLI Tool with 3 Subcommands
Specification
Build a CLI tool called
with three subcommands:mytool,init, andrun. It should be written in Go, have a config file, and include tests.status
Phase 1: Understanding
Scope: CLI tool with 3 commands, Go, config support, tests. Success:
mytool init, mytool run, mytool status all work, tests pass.
Constraints: Go 1.21+, Cobra for CLI framework.
Boundaries:
- Core library (shared code)
- CLI layer (Cobra commands)
- Config system
- Each subcommand
Phase 2: Decomposition
Epic: mytool CLI Task: Project scaffolding (go mod, directory structure) Task: Implement config loading Task: Implement `init` subcommand Task: Implement `run` subcommand Task: Implement `status` subcommand Task: Add unit tests Task: Add integration tests Task: Write README documentation
Phase 3: Dependency Mapping
scaffolding <- config <- init scaffolding <- config <- run scaffolding <- config <- status init, run, status <- unit tests unit tests <- integration tests integration tests <- documentation (docs describe tested behavior)
Phase 4: Instantiation
# Create epic bd create "mytool CLI" -t epic -p 1 \ -d "CLI tool with init, run, and status subcommands" \ --acceptance "All commands work, tests pass, README complete" # Returns: bd-m7k2 # Create tasks with hierarchical IDs bd create "Project scaffolding" -t task -p 1 --parent bd-m7k2 \ -d "Set up go.mod, directory structure, Cobra root command" \ --acceptance "go build succeeds, mytool --help works" # Returns: bd-m7k2.1 bd create "Implement config loading" -t task -p 1 --parent bd-m7k2 \ -d "Config file parsing with Viper, support YAML and env vars" \ --acceptance "Config loads from file and environment" # Returns: bd-m7k2.2 bd create "Implement init subcommand" -t task -p 2 --parent bd-m7k2 \ -d "mytool init creates default config file" \ --acceptance "Running mytool init creates .mytool.yaml" # Returns: bd-m7k2.3 bd create "Implement run subcommand" -t task -p 2 --parent bd-m7k2 \ -d "mytool run executes the main workflow" \ --acceptance "Running mytool run produces expected output" # Returns: bd-m7k2.4 bd create "Implement status subcommand" -t task -p 2 --parent bd-m7k2 \ -d "mytool status shows current state" \ --acceptance "Running mytool status displays state information" # Returns: bd-m7k2.5 bd create "Add unit tests" -t task -p 2 --parent bd-m7k2 \ -d "Unit tests for config, init, run, status packages" \ --acceptance "go test ./... passes with >70% coverage" # Returns: bd-m7k2.6 bd create "Add integration tests" -t task -p 3 --parent bd-m7k2 \ -d "End-to-end tests running actual CLI commands" \ --acceptance "Integration test suite passes" # Returns: bd-m7k2.7 bd create "Write README documentation" -t task -p 3 --parent bd-m7k2 \ -d "README with installation, usage, and examples" \ --acceptance "README covers all commands with examples" # Returns: bd-m7k2.8 # Add dependencies bd dep add bd-m7k2.2 bd-m7k2.1 # config depends on scaffolding bd dep add bd-m7k2.3 bd-m7k2.2 # init depends on config bd dep add bd-m7k2.4 bd-m7k2.2 # run depends on config bd dep add bd-m7k2.5 bd-m7k2.2 # status depends on config bd dep add bd-m7k2.6 bd-m7k2.3 # unit tests depend on init bd dep add bd-m7k2.6 bd-m7k2.4 # unit tests depend on run bd dep add bd-m7k2.6 bd-m7k2.5 # unit tests depend on status bd dep add bd-m7k2.7 bd-m7k2.6 # integration tests depend on unit tests bd dep add bd-m7k2.8 bd-m7k2.7 # docs depend on integration tests
Phase 5: Validation
$ bd ready bd-m7k2.1 P1 task Project scaffolding $ bd dep cycles # (empty - no cycles) $ bd graph bd-m7k2 ┌─────────────────────────────────────────────────────────────┐ │ Layer 0 │ │ ○ bd-m7k2.1 Project scaffolding │ ├─────────────────────────────────────────────────────────────┤ │ Layer 1 │ │ ○ bd-m7k2.2 Implement config loading │ ├─────────────────────────────────────────────────────────────┤ │ Layer 2 │ │ ○ bd-m7k2.3 Implement init subcommand │ │ ○ bd-m7k2.4 Implement run subcommand │ │ ○ bd-m7k2.5 Implement status subcommand │ ├─────────────────────────────────────────────────────────────┤ │ Layer 3 │ │ ○ bd-m7k2.6 Add unit tests │ ├─────────────────────────────────────────────────────────────┤ │ Layer 4 │ │ ○ bd-m7k2.7 Add integration tests │ ├─────────────────────────────────────────────────────────────┤ │ Layer 5 │ │ ○ bd-m7k2.8 Write README documentation │ └─────────────────────────────────────────────────────────────┘ $ bd epic status bd-m7k2 Epic: mytool CLI (bd-m7k2) Progress: 0/8 complete (0%) Ready: 1, Blocked: 7, In Progress: 0
Result: Valid dependency graph with one ready starting point, no cycles, clear execution layers.
BD Command Reference
Initialization
bd init # Interactive initialization bd init --quiet # Non-interactive (for agents) bd init --prefix myproj # Custom ID prefix
Creating Issues
bd create "Title" [flags] Flags: -t, --type string # epic|feature|task|bug|chore (default: task) -p, --priority string # 0-4 or P0-P4 (default: 2) -d, --description string # Issue description --parent string # Parent issue ID for hierarchical child --acceptance string # Acceptance criteria -l, --labels strings # Labels (comma-separated) -a, --assignee string # Assignee --deps strings # Dependencies on create (type:id format) --json # JSON output
Dependency Management
bd dep add <issue> <depends-on> [-t type] # Add dependency bd dep remove <issue> <depends-on> # Remove dependency bd dep tree <issue> # Show dependency tree bd dep tree <issue> --direction=up # Show what this blocks bd dep cycles # Detect cycles bd dep list <issue> # List dependencies
Dependency types:
blocks (default), related, parent-child, discovered-from, tracks
Querying Issues
bd ready # Show ready work (no blockers) bd ready --json # JSON output for parsing bd ready --limit 5 # Limit results bd ready --assignee name # Filter by assignee bd ready --label backend # Filter by label bd list # List all open issues bd list --all # Include closed bd list --parent bd-XXX # Children of specific parent bd list --status open # Filter by status bd show <id> # Show issue details bd show <id> --json # JSON output bd blocked # Show blocked issues bd graph <id> # ASCII dependency visualization bd graph --all # All open issues
Updating Issues
bd update <id> [flags] Flags: --status string # open|in_progress|closed --claim # Atomically claim (set in_progress + assignee) --title string # New title -d, --description string # New description -p, --priority string # New priority --acceptance string # Acceptance criteria --add-label strings # Add labels --remove-label strings # Remove labels
Closing Issues
bd close <id> # Close an issue bd close <id> -r "reason" # Close with reason bd close <id> --suggest-next # Show newly unblocked after close
Epic Management
bd epic status <id> # Show epic completion status bd epic close-eligible # Close epics where all children complete
Swarm Operations
bd swarm validate <epic> # Validate epic structure for swarming bd swarm create <epic> # Create swarm molecule from epic bd swarm status # Show swarm status
Sync and Data
bd sync # Sync with git (export + commit + pull + push) bd export -o file.jsonl # Export to JSONL bd import -i file.jsonl # Import from JSONL
Anti-Patterns
Over-Decomposition
Symptom: 50+ tiny tasks for a simple feature. Problem: Graph noise, overhead exceeds value. Fix: Merge related micro-tasks, aim for 30min-3hr tasks.
Under-Decomposition
Symptom: One "Implement everything" task. Problem: No progress visibility, can't parallelize. Fix: Break into functional units with clear boundaries.
Missing Dependencies
Symptom:
bd ready shows tasks that actually can't start.
Problem: Implicit dependencies not captured.
Fix: Trace each task's true prerequisites, add blocking deps.
Cycle Creation
Symptom:
bd dep cycles returns results.
Problem: Deadlock - nothing can complete.
Fix: Identify the spurious edge, remove it.
Orphaned Beads
Symptom: Tasks not connected to any epic or dependency. Problem: Lost work, unclear ownership. Fix: Add parent or dependency relationships.
Vague Acceptance Criteria
Symptom: "It works" as acceptance criteria. Problem: No way to verify completion. Fix: Specify testable conditions: "Tests pass", "API returns 200", "Config loads".
Priority Inflation
Symptom: Everything is P0. Problem: No way to triage, paralysis. Fix: Reserve P0 for true blockers, use P1-P2 for normal work.
Ignoring Org Callback
Symptom: Closing spawned epic without updating source org task. Problem: Org task remains in WAITING forever; planning layer out of sync with reality. Fix: Before closing any epic with
source_org_id, run complete-to-org skill to update the org task.
Closing Epic Before Callback
Symptom: Running
bd close on spawned epic, THEN trying to find source_org_id.
Problem: Source reference may become harder to access after close.
Fix: Extract source_org_id and trigger callback BEFORE closing the epic.
Troubleshooting
"bd ready" Returns Empty
Causes:
- All tasks have blockers - check
bd blocked - Cycle exists - run
bd dep cycles - All tasks closed - run
bd list --status open
Fix: Add a task with no dependencies, or break the cycle.
"bd dep add" Fails
Causes:
- Issue ID doesn't exist - verify with
bd show <id> - Would create cycle - check existing deps first
Fix: Verify IDs, reconsider dependency direction.
Hierarchical ID Not Generated
Cause: Missing
--parent flag on create.
Fix: Use
--parent bd-EPIC-ID when creating child tasks.
Sync Conflicts
Cause: Multiple agents modified same JSONL.
Fix:
git pull --rebase bd import -i .beads/issues.jsonl bd sync
Agent Can't Claim
Cause: Another agent already claimed.
Fix: Query
bd ready --unassigned to find unclaimed work.
Related Skills
| Skill | Relationship |
|---|---|
| Produces Planning Context Snapshots consumed during decomposition |
| Executes the beads created by this skill |
| Spawns epics from org-mode tasks |
| Callbacks when spawned epics complete |
| Creates AGENTS.md files that inform codebase context |