Purpose

This skill guides the specification process from an approved design document to an approved specification, ready for dev plan and task decomposition. You are the Specification Writer; the human is the Product Owner.

A specification is a formal distillation of the approved design — terse, testable acceptance criteria that can be used to plan implementation, write tests, and verify the result. It is not an extension of the design, not an implementation plan, and must not contain code.

The three document stages each serve a distinct purpose:

DocumentCharacterContains
DesignDiscursive proseWhat to build and why; alternatives, decisions, rationale
SpecificationTerse and formalVerifiable acceptance criteria distilled from the design
Dev planOperationalTask breakdown, engineering decisions, code sketches

If you find yourself writing code, implementation steps, or engineering notes in a specification, stop — those belong in the dev plan.

Roles

You (Specification Writer): Draft the specification, propose acceptance criteria, identify edge cases, flag ambiguities, and keep the spec aligned with the approved design. Drive the work forward. You do not own what "done" means — that belongs to the human.

Human (Product Owner): Own the acceptance criteria, decide what "done" means, and approve the specification. The spec is done when they say it is done.

When to Use

  • After a design document has been approved
  • When drafting or reviewing acceptance criteria
  • When checking whether a specification is ready for approval
  • When the design leaves implementation questions the spec must resolve

The Specification Process

Specification is iterative. A typical flow:

  1. Design is approved — the stage gate to specification is open
  2. Agent drafts the specification from the approved design
  3. Human reviews and gives feedback
  4. Agent revises; steps 2–3 repeat until no open questions remain
  5. Human approves
  6. Workflow moves to dev plan and task decomposition

Do not begin specification until the design is approved. If no approved design exists, apply the emergency brake — see

kanbanzai-workflow
.

What a Good Specification Contains

At minimum:

  1. Scope — what is being specified and what is explicitly excluded
  2. Acceptance criteria — each independently testable and verifiable (see below)
  3. Constraints — performance, compatibility, security, or operational requirements
  4. Out-of-scope — explicit exclusions that prevent scope creep downstream

A good specification is terse. Each section exists to support a set of acceptance criteria, not to explain or re-argue the design. If a passage could be removed without losing a verifiable criterion, remove it.

What a Spec Must Not Contain

  • Code — no implementation examples, no pseudocode, no schema definitions
  • Implementation notes — no "how to build it" guidance; that belongs in the dev plan
  • Design rationale — no "we chose X because Y"; the design document owns that
  • Alternatives — a spec reflects one chosen direction (same rule as the design)
  • Narrative padding — no prose that does not directly support a testable criterion

Acceptance Criteria Quality Bar

Every acceptance criterion must be:

  • Testable — an unambiguous pass/fail determination is possible without interpretation
  • Independent — verifiable without reference to other criteria
  • Specific — names the exact behaviour, input, output, or state being verified

"It works correctly" is not an acceptance criterion. Neither is "it handles errors gracefully" or "performance is acceptable." Rewrite vague criteria as concrete, falsifiable statements before marking a spec ready for approval.

When you find a criterion that fails the quality bar, rewrite it. Do not accept vague criteria and hope the implementing agent will interpret them generously.

The Approved Specification Invariant

A specification is ready for approval when:

  1. All acceptance criteria meet the quality bar above
  2. No unresolved questions remain
  3. Scope matches the approved design — no additions, no omissions
  4. One direction is chosen throughout — no alternatives or open forks

When the human approves verbally, record it immediately:

doc(action="approve", id="DOC-...")

Relationship to Design and Dev Plan

The pipeline is: design → specification → dev plan.

  • The design says what to build and why — prose with decisions and rationale.
  • The specification says what to verify — a terse formal distillation of the design.
  • The dev plan says how to build it — tasks, engineering notes, code sketches.

A specification is a distillation, not an extension. Every requirement in the spec must trace back to the approved design. If you find yourself writing acceptance criteria for something not in the design, stop — that is scope addition and requires updating the design first.

If the spec contradicts the design, the design governs. Surface the conflict to the human — do not silently resolve it in either direction.

If the spec requires a decision the design left open, stop and ask. Adding scope not in the approved design is a stage-gate violation — see

kanbanzai-workflow
emergency brake.


Gotchas

Forgetting to register the document. After creating the specification file, call

doc
with action:
register
immediately. Unregistered specs are invisible to the approval workflow, health checks, and task decomposition.

Spec full of code or implementation detail. If the specification contains code snippets, schema definitions, pseudocode, or "how to build it" notes, it has absorbed content that belongs in the dev plan. Move that content to the dev plan. A spec that reads like an implementation guide will cause agents to skip the dev plan stage or produce a dev plan that merely repeats the spec.

Approving with ambiguous criteria. The implementing agent will interpret ambiguous criteria literally and differently than you intended. Fix criteria before approval, not after rework.

Adding scope not in the design. If the spec starts to contain requirements that were not in the approved design, stop. This is a scope addition — it may require updating the design first. Apply the emergency brake.

Editing an approved specification. The same rules as an approved design — create a new document and supersede the old one. Do not silently edit an approved spec. The content hash is recorded at approval time; silent edits break referential integrity.

doc(action="supersede", id="old-DOC-...", superseded_by="new-DOC-...")

Verbal approval not recorded. Call

doc
with action:
approve
immediately when the human approves in conversation. Unrecorded approval does not satisfy the stage gate — the next operation will fail.


Related

  • kanbanzai-design
    — what happens before specification (the approved design is the input to this stage)
  • kanbanzai-workflow
    — stage gates and the specification → dev plan progression
  • kanbanzai-documents
    — document registration, drift, approval, supersession
  • kanbanzai-agents
    — task dispatch and the dev plan stage that follows approval